Every connection starts on paper.

Peklar Engineering produces electrical designs, cable routes, piping systems and 3D models for yachts and infrastructure. Accurate, verifiable and on time.

Actual cable routes around the NDSM wharf, Amsterdam — Liander open data

Motor yacht on the open sea

Photo: Chris Jones / Unsplash

From first sketch to as-built

A selection of the drawings we produce: cable routes on board, trench profiles in public space and everything in between.

FR0FR30FR60FR90FR120FR150FR180DWLBLEngine roomG1G2MEMSBShore power 400 V 3~ 50 HzMSB — Main switchboardDB-1BridgeNavigation & radarBTBattery bank 24 V DCBT — Bow thruster · SG — Steering gear
50 m motor yacht — main electrical routesSample drawing
12001000800 coverFootpathCarriagewayGround level ±0Warning tapeMV 3×1×240 Al XLPE 10 kVLV 4×150 AlFibre 4× Ø40 HDPEGas PE Ø110Sand surround
Trench profile — cables and pipesSample drawing

From intake to as-built

A clear process with fixed checkpoints. You always know which revision is current and what comes next.

  1. Intake

    We discuss scope, design basis, standards and your drawing template. You receive a proposal with schedule and price.

  2. Survey

    We gather existing drawings and data. Where needed we survey on site or 3D-scan the existing situation.

  3. Basic design

    Main diagrams, routes and system layout are developed and agreed with you before we go into detail.

  4. Detail engineering

    Full development into installation- or construction-ready drawings, including schedules and calculations.

  5. Check

    Every drawing is checked by a second engineer against a fixed checklist: the four-eyes principle.

  6. Delivery & as-built

    We deliver in the agreed formats and, after construction, turn redlines into an up-to-date as-built record.

Approach

Got a project on the drawing board?

Send us your drawings, sketches or specifications. We review your request and come back with a proposal and schedule.

Request a quote